Production information of steel structure export form VMSTEEL
| Model NO. | Steel Structure | Type of Steel For Building Structure | High-Strength Steel |
| Carbon Structural Steel | Q235 | Residential Wall Structure | Wall Stud |
| Application | Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor | Material Grade | Q235B/Q345b |
| Painted | Epoxy Primer/PU/Alkyd Paint/Epoxy Zinc Rich Primer | Roof and Wall Cladding | Sandwich Panel or Colored Corrugated Plate |
| Panel Insulation | PU/PIR/EPS/Rock Wool/Fiberglass Wool, etc. | Door | Sliding Door or Rolling Door |
| Window | PVC/Plastic Steel/Aluminum Alloy Window | Drainage | Gutter and Downpipe |
| Drawing Software | X-Steel/Autocad | Packing & Delivery | Load Into 20gp, 40gp/ 40hq Containers |
| Details | as Per Customer Requirement | Transport Package | Sea Worthy Packing in Container |
| Specification | Sea Worthy Packing in Container | Origin | VMSTEEL, Vietnam |
| HS Code | 9406900090 | Production Capacity | 2000 Tons/Month |
Product Description - Steel structure export to africa
Prefabricated Workshop Steel Structure Parts
Our steel structure manufacturing process
VMSTEEL is the leading steel structure manufacturer in Vietnam
With more than 10 years history, VMSTEEL has vast experiences in design, production, transportation and installation of steel building systems. We have been committed to providing customers with the most reasonable and economical solution, so that the customers can achieve steel building dream. Based on 10 years of development, we have a professional management team in steel structure design, production and installation, meanwhile, we continue to develop new technologies, new panels, and access to a number of national patents. The production management has obtained ISO9001 certification. steel structure export
We have the Competitive Price
- Long term partnerships with raw material product suppliers give us the ability to control quality and price effectively.
- Large-scale production reduces our procurement, production and management costs, which can bring customers more economic benefits.
- We produce both steel structure (frame) and wall and roof panels, reducing external sourcing, ensuring consistency in product quality and further saving on costs. import steel structure from vietnam
- For us, the end of a project is not you pay us to get the products, but you successfully complete the installation of our products. steel structure export
Good Quality
Reputation import steel structure from vietnam VMSTEEL JSC
Packing & Shipping
- Packing the main frame steel structure components together with secondary parts by channnel tray and belt.
- Packing the purlin into the bundles by the steel strip
- packing the small parts by bags and EPS foam
- packing sets parts by some box
- Loading all the packages into the container.
Delivery Time:
- 30 – 60 days after deposit and drawing confirmation (depending on the volume of the order to be produced)
Payment Terms
- Common sense to suit the interests of both parties
If you are interested in our any products, pls kindly contact me.
Contact VMSTEEL immediately for consulting support and steel structure quote
- Email: cskh.vietmysteel@gmail.com
- Hotline global: +84-914.614.489 Mr. Le
- Hotline in Vietnam: 0975.725.709
- Factory 1: 1/9 Do Van Day Street, Tan Hiep Commune, Hoc Mon District, Ho Chi Minh City, Vietnam
- Factory 2: Thuan Giao 25 Street, Thuan Giao Ward, Di An Town, Binh Duong Province.
- Factory 3: Road DT 824, Duc Hoa Dong Hamlet, Duc Hoa District, Long An Province.
Q&A about importing steel from VMSTEEL Vietnam Joint Stock Company
Please feel free to send us any questions you would like assistance with about importing structural steel products from Vietnam. VMSTEEL will reply to you immediately after receiving your request. We appreciate your interest and contributions
- VAT on exporting Steel: pursuant to current stipulations, VAT on exported commodity is 0%
- Export duty: Steel is not in Vietnam’s nomenclature of taxable exports, therefore, the exporters do not have to pay export tax.







